Annual Report and Accounts 2024/25

Summary

2024-2025 was a busy year for cycling in our borough.

There were a number of very positive developments in terms of new, high-quality infrastructure being opened and being built. The first completed sections of the long-fought for Romford Road cycle track officially opened. So has the first section of the Westfield Avenue cycleway, turning one of the worst streets in the borough for cycling (a dreadful “stroad” type design left over from the Olympics) to one of the best. The Royal Docks Corridor scheme from Canning Town to Pontoon Dock and London City Airport is nearing completion, and is truly great. We have also seen a number of public realm improvements and permanent mode filter upgrades, and the roll-out of the borough-wide 20mph limit. Work has also just begun on phase 1a of Cycle Future Route 7 from Leyton to Stratford Town Centre, which will improve one of the worst parts of Cycleway 16 and deliver a much-needed cycling connection over the Great Eastern Railway.

The new West Ham Park LTN, despite some opposition, appears to have settled in and is working well. This scheme in particular is a game changer, as Newham are delivering it simultaneously with the Romford Road works. This is the first time the Council has treated both side roads and main roads at the same time, providing a joined-up network of safer streets.

We are pleased that the ambition shown by portfolio holders and officers at Newham Council is generally high. We have seen some positive consultations for future schemes, for instance for the crossing of Water Lane on the Stratford-Forest Gate backstreet Cycleway link.

Unfortunately, there were also negative developments, particularly the sudden long-term closure of the Greenway, TfL Cycleway 22, by Thames Water in September 2024. At time of writing the Greenway at West Ham has now been unusable for 7 months, which has had a serious impact on children, families, and NHS workers at Newham Hospital who relied on it for their travel. We have had more contact about the Greenway than any other campaigning issue in the history of Newham Cyclists. Newham Council’s diversion is not fit for purpose, after somewhat nebulous fears about traffic displacement from the Police led to them abandoning their original plan to close Abbey Road E15 to general traffic. It is also now clear the “temporary” closure of the Greenway will be longer than the originally planned 18 months. We have also been monitoring the long-term closure of the ExCeL waterfront path on NCN route 13, which raises similar concerns about the cycle network’s dependence on permissive paths that private landowners can close at will.

Considerable disruption has arisen from works for the construction and mitigation of the Silvertown Tunnel, an urban motorway project that TfL has mortgaged £2.2bn of future tolls on. The desultory “cycle shuttle” (bike bus) is not an adequate mitigation, and has already proven in its first weeks to be inadequate for the demand to cross the river by cycle east of Tower Bridge.

A continued lack of action on legacy unprotected junctions has also been evident. Tragically, Newham saw its first cycling fatality in 4½ years in mid-January 2025, at a known dangerous junction on TfL Cycleway 2 on Stratford High Street. The person killed was a man in his 20s. This section of Cycleway 2 features 4 of the 6 most dangerous junctions on our list, and at each, the physical separation for cycling disappears. We have pushed the Council and TfL to stop accepting the “Cycleway” designation as a fait accompli, and to get on with treating the dangerous junctions in line with best practice standards. We are pleased that both Newham Council and TfL recognise the need for rapid action, but they must work together to deliver a meaningful, permanent scheme, speedily, and without being watered down, mired in endless rounds of traffic modelling, or punted out to the next political cycle.